Prices
The prices include: labor; rough materials; transportation of materials/delivery to the apartment and removal/disposal of construction waste. The price does not include finishing materials, also known as white materials.
White carcass
405 GELAverage duration : 30-60 days
- Transparent estimate on the website.
Electro-technical works
- Installation of visible switches, plugs, lamps and etc
Plumbing (Сантехника)
- Installation of pipelines, bathroom drainer and sewage system;
- Installation of sink, bath, toilet bowl, towel dryer
- Installation of heating boiler and radiators
Floor
- Floor screeding (only in bathroom);
- Putting the laminate, tiles
- Installation of plastic plinths;
Walls
- Preparation of walls for painting or hanging the wallpapers;
- Wall plastering with sand&cement (only in bathroom);
- Installation of wall tiles;
- Installation of foam between wall and ceiling;
Ceiling
- Installation of one gypsum board, coating; painting;
- Installation of French stretching ceiling (only in bathroom);
Doors
- Installation of MDF doors;
- Installation of metal-plastic doors for bathrooms;
- Cleaining, dispoasal of building wastes;
- 5 %
Black carcass
570 GELAverage duration: 60-90 days
- Transparent estimate on the website.
Electro-technical works
- Installation of new cable;
- Installation of visible switches, plugs, lamps and etc
Plumbing (Сантехника)
- Installation of pipelines, bathroom drainer and sewage system;
- Installation of sink, bath, toilet bowl, towel dryer;
- Installation of heating boiler and radiators;
- Installation of radiators.
Floor
- Floor screeding;
- Putting the laminate, tiles;
- Installation of plastic plinths
Walls
- Wall plastering with Lime plaster and/or installation of gypsum boards ;
- Wall plastering with sand&cement (only in bathroom);
- Preparation of walls for painting or hanging the wallpapers; •
- Installation of wall tiles;
- Installation of foam between wall and ceiling.
Ceiling
- Installation of one gypsum board, coating; painting;
- Installation of French stretching ceiling (only in bathroom);
Doors
- Installation of MDF doors;
- Installation of metal-plastic doors for bathrooms.
- Cleaining, dispoasal of building wastes.
Green carcass
380 GELAverage duration : 30 days
- Transparent estimate on the website.
Electro-technical works
- Installation of visible switches, plugs, lamps and etc.
Plumbing (Сантехника)
- Installation of sink, bath, toilet bowl, towel dryer;
- Installation of heating boiler and radiators
Floor
- Putting the laminate, tiles;
- Installation of plastic plinths
Walls
- Wall painting and/or hanging the wallpaper;
- Installation of wall tiles;
Ceiling
- Installation of foam between wall and ceiling.
- Coating of gypsum boards; painting ;
- Installation of French stretching ceiling (only in bathroom);
Doors
- Installation of MDF doors;
- Installation of plastic doors for the bathrooms
- Cleaning, disposal of building waste materials.